Saturday, March 10, 2012

ATH-Nordegg

Jo kuukauden takaa:
In late fourth quarter of 2011, Athabasca also drilled and completed its second Kaybob Nordegg horizontal well at 04-11-63-20W5, offsetting its first successful Nordegg well at 13-14-63-20W5. After completing the 16 stages of slickwater fractures, the 04-11 well flow tested at a final rate (after four days of clean up) of 420 boe/d, (335 bbl/d of 41 degree API oil and 500 thousand cubic feet per day (mcf/d) gas), at a flowing pressure of 910 psig. Based on the success of this second Nordegg test, the Company will focus its Nordegg delineation on the Kaybob area with further horizontal drilling, core analysis and incorporation of the Company's recently acquired 3D seismic dataset.


Montney:
The company recently drilled and completed its first Montney horizontal well in the Kaybob East area, located at 13-22-64-18W5. The 1,220 metre lateral was fracture stimulated with 14 stages of energized oil treatments and was flow tested during 78 hours. During the final 24 hours of the test and after having recovered all the load fluids, the well flowed at an average rate of 2,560 barrels of oil equivalent per day (boe/d), (2,265 barrels per day (bbl/d) of 41 degree API oil with 1.8 million cubic feet per day (mmcf/d) gas), at a stabilized flowing pressure of 450 pounds per square inch gauge (psig). The well is currently shut in until it can be connected to infrastructure. The company holds a significant land position offsetting this well and will continue the delineation of the Kaybob East acreage throughout first quarter of 2012.


Tämä kaivo näyttää olevan Trilogyn Kaybob Montney-poolissa ja jos on TETin karttaa uskominen niin tämän pitäisi olla gas capissa. Testiluku kylläkään viittaa siihen että tämä olisi porattu gas cappiin.

No comments: